Construction process of inflatable membrane structure
Release time:
2023-10-24
Inflatable membrane structure is a kind of building structure system which uses special building membrane material as the shell, uses intelligent air membrane electromechanical equipment to provide the positive pressure of air inside the air membrane building, and uses the pressure difference to support the main body of the building. It does not need any internal frame or beam support, and the maximum span can reach 150 meters.
The air membrane building system mainly includes foundation anchoring system, membrane main body system, cable network system, mechanical system, control system, access control system, lighting system and so on. It seems that there are many systems, but the actual construction process is not complicated, and it only takes a few months to build a fully functional gas membrane building.
Today, the air membrane manufacturers with Beijing Xinyuan Yijia membrane structure Technology Co., Ltd. Xiaobian together to understand the air membrane construction process!

Before the construction work starts, the designer will have in-depth communication with the customer, optimize the design drawings, and give the design plan that meets the requirements. After the design scheme is confirmed to be correct, the construction process can be entered.
As we all know, the main part of the air membrane building can be divided into three major plates: membrane body, foundation and cable network. Therefore, the workers will carry out civil construction in strict accordance with the design drawings at the construction site, and bury the aluminum groove and the cable embedment parts. During this period, the air membrane processing plant should also carry out the cutting and processing of membrane materials and the production of air membrane-related equipment.
After the production of air membrane related equipment is completed and the civil construction of the construction site is completed, it is necessary to arrange the equipment and membrane material to enter the field and prepare for the installation work. Before the installation work begins, it is necessary to level the site and lay protective membrane to prevent the membrane material from being scratched.
After the aerated membrane body, air membrane equipment, entrance and exit system, cable mesh and other accessories are installed one by one according to the requirements of the drawings, it is necessary to firmly connect the membrane unit to the foundation anchoring system. After the above installation process is completed, the inflating work and debugging equipment can be carried out. It should be noted that during this process, all devices should be checked in time to see if they are working properly.
After the inflation is completed, the insulation system and lighting system can be installed. The construction personnel of the air membrane manufacturer have completed the installation of all projects, the commissioning of all air membrane equipment is completed, and the construction site can be cleaned up.