As we all know, the air membrane building is supported by air, and the air pressure that maintains the shape of the air membrane comes from the supporting fan equipment. Therefore, many people will be worried about, in the event of power failure in the air museum activities, how to do? Will the air membrane hall collapse?


In fact, regarding the problem of power outage in the air membrane building, the air membrane manufacturer Beijing Xinyuan Yijia Membrane Structure Technology Co., Ltd. has already prepared a response plan for you in advance - In order to prevent emergencies, in addition to configuring one main and one standby two typhoon machines, each air membrane building will also configure backup power. In the event of a mains power failure, the standby generator set will be automatically activated.
Common backup power supplies are as follows:
1, diesel generator: easy to install, but not easy to start at low temperatures.
2, air generator: need natural air or air to do energy, not affected by the environment.
3, gasoline generator: in the absence of natural air site use, not affected by the environment.
The most commonly used backup power supply of Beijing Xinyuan Yijia Membrane Structure Technology Co., Ltd. is a diesel generator. Under normal conditions, the backup diesel generator system can work for 48 hours, which is enough to maintain the normal operation of the air membrane venue. After the mains recovers, the intelligent control system switches the power supply system to the mains, and the standby power automatically shuts down. For the power failure problem, the majority of users do not need to worry too much.